Innovating the Intelligence of Formal Techniques for Automatic Design Verification
Blog Archive
February 2012
2/15/2012: Avoiding the Titanic-Sized Iceberg of Downton Abbey
January 2012
1/24/2012: A Meaningful Present for the New Year
August 2011
8/02/2011: A Quick History of Clock Domain Crossing (CDC) Verification
July 2011
7/26/2011: Hardware-Assisted Verification and the Animal Kingdom
7/13/2011: Advanced Sign-off…It’s Trending!
May 2011
5/24/2011: Learn about Advanced Sign-off Verification at DAC 2011
5/16/2011: Getting A Jump On DAC
5/09/2011: Livin’ on a Prayer
5/02/2011: The Journey to CDC Sign-Off
April 2011
4/25/2011: Getting You Closer to Verification Closure
4/11/2011: X-verification: Conquering the “Unknown”
4/05/2011: Learn About the Latest Advances in Verification Sign-off!
March 2011
3/21/2011: Business Not as Usual
3/15/2011: The Evolution of Sign-off
3/07/2011: Real People, Real Discussion – Real Intent at DVCon
February 2011
2/28/2011: The Ascent of Ascent Lint (v1.4 is here!)
2/21/2011: Foundation for Success
2/08/2011: Fairs to Remember
January 2011
1/31/2011: EDA Innovation
1/24/2011: Top 3 Reasons Why Designers Switch to Meridian CDC from Real Intent
1/17/2011: Hot Topics, Hot Food, and Hot Prize
1/10/2011: Satisfaction EDA Style!
1/03/2011: The King is Dead. Long Live the King!
December 2010
12/20/2010: Hardware Emulation for Lowering Production Testing Costs
12/03/2010: What do you need to know for effective CDC Analysis?
November 2010
11/12/2010: The SoC Verification Gap
11/05/2010: Building Relationships Between EDA and Semiconductor Ventures
October 2010
10/29/2010: Thoughts on Assertion Based Verification (ABV)
10/25/2010: Who is the master who is the slave?
10/08/2010: Economics of Verification
10/01/2010: Hardware-Assisted Verification Tackles Verification Bottleneck
September 2010
9/24/2010: Excitement in Electronics
9/17/2010: Achieving Six Sigma Quality for IC Design
9/03/2010: A Look at Transaction-Based Modeling
August 2010
8/20/2010: The 10 Year Retooling Cycle
July 2010
7/30/2010: Hardware-Assisted Verification Usage Survey of DAC Attendees
7/23/2010: Leadership with Authenticity
7/16/2010: Clock Domain Verification Challenges: How Real Intent is Solving Them
7/09/2010: Building Strong Foundations
7/02/2010: Celebrating Freedom from Verification
June 2010
6/25/2010: My DAC Journey: Past, Present and Future
6/18/2010: Verifying Today’s Large Chips
6/11/2010: You Got Questions, We Got Answers
6/04/2010: Will 70 Remain the Verification Number?
May 2010
5/28/2010: A Model for Justifying More EDA Tools
5/21/2010: Mind the Verification Gap
5/14/2010: ChipEx 2010: a Hot Show under the Hot Sun
5/07/2010: We Sell Canaries
April 2010
4/30/2010: Celebrating 10 Years of Emulation Leadership
4/23/2010: Imagining Verification Success
4/16/2010: Do you have the next generation verification flow?
4/09/2010: A Bug’s Eye View under the Rug of SNUG
4/02/2010: Globetrotting 2010
March 2010
3/26/2010: Is Your CDC Tool of Sign-Off Quality?
3/19/2010: DATE 2010 – There Was a Chill in the Air
3/12/2010: Drowning in a Sea of Information
3/05/2010: DVCon 2010: Awesomely on Target for Verification
February 2010
2/26/2010: Verifying CDC Issues in the Presence of Clocks with Dynamically Changing Frequencies
2/19/2010: Fostering Innovation
2/12/2010: CDC (Clock Domain Crossing) Analysis – Is this a misnomer?
2/05/2010: EDSFair – A Successful Show to Start 2010
January 2010
1/29/2010: Ascent Is Much More Than a Bug Hunter
1/22/2010: Ascent Lint Steps up to Next Generation Challenges
1/15/2010: Google and Real Intent, 1st Degree LinkedIn
1/08/2010: Verification Challenges Require Surgical Precision
1/07/2010: Introducing Real Talk!

Learn about Advanced Sign-off Verification at DAC 2011

Craig Cochran   Craig Cochran
   VP of Marketing and Business Development for Real Intent

If you are coming to DAC 2011 in San Diego, June 6th through 8th, you’ll want to make sure you visit Real Intent in booth #2131 to learn about the latest technology for Advanced Sign-off Verification.

Real Intent will feature its Ascent™ XV solution, the industry’s first and only solution for comprehensive X-verification and sign-off. Ascent XV isolates and eliminates functional bugs that are masked by X (unknown value) propagation in RTL simulation, and reduces gate-level simulation debugging due to mismatches between RTL and gate-level simulation results caused by differing X interpretation.

Also to be featured are the latest advances in Meridian™ CDC, the industry’s flagship Clock Domain Crossing sign-off verification solution, and new capabilities within Ascent Lint, the industry’s fastest and most accurate lint solution, which is complemented by automatic formal checks in Ascent IIV (Implied Intent Verification).

Real Intent will also show Meridian DFT, its Design-for-Test verification solution, and PureTime™, its constraints management solution with glitch-aware exception verification.

And, to learn what solutions will be crucial to verifying the billion-gate designs that are right around the corner, be sure to hear Real Intent CEO Prakash Narain along with other experts from Intel, Broadcom, NVIDIA, Qualcomm and Mindspeed on the DAC technical panel entitled:

“The Billion Dollar Question: How to Verify Billion-Gate Designs”

Wednesday, June 8, 2011 – 4:00 PM to 6:00 PM – Room 33ABC – For details, Click here

Next-generation chips will contain literally billions of gates that need to be verified before committing to silicon. With billions of dollars at stake, the right solution is crucial for verifying designs susceptible to complex failures arising from corner-case confluences of timing and functionality. This panel will debate the merits of emerging solutions for such self-contained verification problems that threaten to subvert the nominal “simulation plus STA” verification flow.

TO BOOK A PRIVATE DEMO SUITE APPOINTMENT:

If you’d like to learn how to comprehensively sign-off on your RTL code for X-accuracy, CDC integrity, syntax, semantics, DFT and constraints integrity, then please be sure to book your private meeting with Real Intent’s experts by visiting www.realintent.com/events/dac.php.  Appointments are available Monday through Wednesday, 9 AM to 6 PM, but slots are limited, so register TODAY!

TO VIEW A BOOTH DEMO:

  • Please visit booth #2131 at DAC 2011
  • Complete a short survey at the booth to enter our drawing!

We look forward to seeing you at the show!

May 24, 2011

blog comments powered by Disqus